← Projects & Building Types

Office

Start with elevations and the façade module, then review daylight, heat, and the openings the building actually needs.

Start with the building brief

What to confirm before choosing a system

01

Start with elevations and modules

Grid size, floor levels, and opening rhythm are the starting points for assessing the system.

02

Daylight and solar heat

Choose Low-E, IGU, or shading systems according to the building orientation and performance goals.

03

Interfaces and weathering

Check interfaces with solid walls, floors, and roofs against the drainage and weathering details.

Related systems

Choose from the project requirement

For an initial quotation

Send the drawings, sizes, and programme you have

The NESTA team will review the system, dimensions, and project conditions that need confirmation before finalising the scope and quotation.

Send project details
Call usLINEGet a quote